2026/27
Bus Stop Construction
A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.
Please note: If your district is not listed, there is no construction planned for 2026/27.
| Bus Stop Location | Nearest civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest civic Address | Location of Work | Scope of Work | Status |
| Barnes Dr At Civic 677 (9013) | 677 Barnes Dr | South east side of Barnes Dr | Installation of concrete bus pad, curb and sidewalk from civic 601 to civic 667 and sign post | Starting September 2026 |
| Barnes Dr At Civic 619 (9014) | 619 Barnes Dr | South east side of Barnes Dr | Installation of concrete bus pad, curb and sidewalk from civic 601 to civic 667 and sign post | Starting September 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Eisener Blvd After Norm Newman Dr (6627) | 15 Eisener Blvd | East side of Eisener Blvd across from Civic 14 | Replacement of concrete bus pad | Started September 2026 |
| Eisener Blvd Before Woodlawn Public Library (6639) | 35 Eisener Blvd | Northeast side of Eisener Blvd from Civic 35 to Civic 31 | Relocation of bus stop approximately 25m west, installation of new concrete bus pad | Started September 2026 |
| Portland Estates Blvd West before Eisener Blvd (2400) | 50 Portland Estates Blvd West | Northwest side of Portland Estates Blvd West across from Civic 50 | Installation of new concrete bus pad | Started September 2026 |
| Portland Hills Dr After Summer Field Way (2270) | Opposite 527 Portland Hills Dr | West side of Portland Hills Dr across from Civic 527 | Installation of new concrete bus pad | Started September 2026 |
| Portland Hills Dr At Civic 537 (8839) | 537 Portland Hills Dr | East side of Portland Hills Dr at Civic 537 | Concrete curb repairs | Started September 2026 |
| Russell Lake Dr After Hillview Dr (8253) | Opposite 58 Russell Lake Dr | West side of Russell Lake Dr across from Civic 58 | Replacement of concrete bus pad | Started September 2026 |
| Russell Lake Dr At Civic 52 (8258) | 52 Russell Lake Dr | East side of Russell Lake Dr from Civic 52 to Civic 54 | Installation of new concrete bus pad with pedestrian ramp that connects to new pedestrian ramp on the west side of Russell St | Started September 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Astral Dr Before Carisbrooke Ln (6055) | 1 Carisbrooke Ln | Southwest side of Astral Dr adjacent 1 Carisbrooke Lane | Removal of bus stop, Astral Dr Before Carisbrooke Ln (6055) and Sherwood St After Astral Dr (2244) to be consolidated at new location Astral Dr Before Sherwood St (2399) | Completed August 2026 |
| Astral Dr Before Sherwood St (2399) | 369 Astral Dr | Southwest side of Astral Dr | Installation of new bus stop including concrete bus pad with sidewalk connection to Sherwood St and pedestrian ramps at intersection | Completed August 2026 |
| Astral Dr Before Shrewsbury Rd (6058) | 311 Astral Dr | Southwest side of Astral Dr | Replacement of concrete bus pad and installation of new sidewalk connection to Shrewsbury Rd with pedestrian ramps at intersection | Completed October 2026 |
| Cole Harbour Rd After Armbro Ln (6475) | 1108 Cole Harbour Rd | South side of Cole Harbour Rd | Relocation of bus stop approximately 8m east, installation of new concrete bus pad and shelter pad, reinstatement of shelter and bench | Starting October 2026 |
| Cole Harbour Rd After Cumberland Dr (6477) | 1022 Cole Harbour Rd | South side of Cole Harbour Rd | Replacement of concrete bus pad, retaining wall and sidewalk | Starting October 2026 |
| Cole Harbour Rd After Perron Dr (2404) | 1177 Cole Harbour Rd | North side of Cole Harbour Rd | Installation of new concrete bus pad between sidewalk and road, installation of new signage | Starting October 2026 |
| Cole Harbour Rd Before Perron Dr (2405) | 1182 Cole Harbour Rd | South side of Cole Harbour Rd | Installation of new concrete curb and bus pad between sidewalk and road, installation of new signage | Starting October 2026 |
| Cole Harbour Rd Before Perron Dr (9009) | 1207 Cole Harbour Rd | North side of Cole Harbour Rd | Removal of bus stop and signage, bus stop moving to new location Cole Harbour Rd After Perron Dr (2404) | Starting October 2026 |
| Cole Harbour Rd Opposite Perron Dr (9010) | 1200 Cole Harbour Rd | South side of Cole Harbour Rd | Removal of bus stop and signage, bus stop moving to new location Cole Harbour Rd Before Perron Dr (2405) | Starting October 2026 |
| Main St Before Panavista Dr (2241) | 639 Main St | Northwest side of Main St | Replacement of concrete curb | Completed August 2026 |
| Sherwood St After Astral Dr (2244) | 21 Sherwood St | West side of Sherwood St | Removal of bus stop, Astral Dr Before Carisbrooke Ln (6055) and Sherwood St After Astral Dr (2244) to be consolidated at new location Astral Dr Before Sherwood St (2399) | Completed August 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Alderney Dr Before Patuo'Kn (2359) | 11 Canal St | 40m southwest from the new Alderney Dr/Patuo'Kn intersection near 11 Canal St | New stop, installation of concrete bus pad and signpost, installation of new multi-use path | Completed September 2026 |
| Highfield Park Dr Before Civic 65 (6921) | Opposite 90 Highfield Park Dr | East side of Highfield Park Dr opposite Civic 90 | Replacement of the concrete bus pad, concrete curb and sidewalk | Completed July 2026 |
| Hudson Way Before Princess Margaret Blvd (2298) | Near the intersection of Hudson Way and Princess Margaret Blvd | East side of Hudson Way | Relocation of bus stop approximately 26m north, closer to intersection, new concrete pad between curb and sidewalk, removal of existing concrete pad | Construction started February 2026 |
| Thistle St After Mayflower St (8386) | 98 Thistle St | East side of Thistle St abutting Civic 98 | Additional concrete at stop to increase bus pad length | Pending 2026 construction |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Marketplace Dr After Bancroft Ln Bay 3 (2034) | 111 Marketplace Dr | East side of Marketplace Dr | Removal of bus stop signage and shelter, bus stop will be temporarily relocated during Wrights Cove Terminal construction and replaced by the terminal once the terminal is completed | Pending 2026 construction |
| Marketplace Dr Before Bancroft Ln Bay 4 (6014) | 100 Marketplace Dr | West side of Marketplace Dr | Removal of bus stop signage, bus stop will be temporarily relocated during Wrights Cove Terminal construction and replaced by the terminal once the terminal is completed | Pending 2026 construction |
| Mt Edward Rd After Lucien Dr (7266) | 119 Mount Edward Rd | North side of Mount Edward Rd | Installation of shelter on new shelter pad | Completed February 2026 |
| Portland St After Spring Ave (8047) | 3 Spring Ave | North side of Portland St, 50-40m from the Portland St - Spring Ave intersection | Replacement of concrete bus pad and curb repairs | Started August 2026 |
| Spring Ave Before Pembroke Ct (8325) | Opposite 3 Spring Ave | East side of Spring Ave opposite Civic 3 | Removal of concrete bus pad | Completed August 2026 |
| Spring Ave Before Portland St (8680) | 3 Spring Ave | West side of Spring Ave near Civic 3 | Removal of concrete bus pad | Completed August 2026 |
| Woodlawn Rd After Ellenvale Ave (8593) | 92 Woodlawn Rd | West side of Woodlawn Road | Replacement of concrete curb and concrete bus pad | Completed June 2026 |
| Woodlawn Rd After Guysborough Ave (8588) | 76 Woodlawn Rd | Northwest side of Woodlawn Road | Replacement of concrete curb | Completed July 2026 |
| Woodlawn Rd After Mt Edward Rd (8590) | 54 Woodlawn Rd | West side of Woodlawn Rd near Civic 54 | Replacement of concrete curb at bus stop | Completed July 2026 |
| Woodlawn Rd Before Belle Vista Dr (8595) | 79 Woodlawn Rd | Southeast side of Woodlawn Rd | Replacement of concrete curb and sidewalk | Completed July 2026 |
| Woodlawn Rd Before Mt Edward Rd (8592) | 61 Woodlawn Rd | East side of Woodlawn Rd near Civic 61 | Replacement of concrete curb at bus stop | Completed July 2026 |
| Woodlawn Rd Before Saguenay Pl (8601) | 106 Woodlawn Rd | Northwest side of Woodlawn Rd | Replacement of concrete curb and signpost | Completed July 2026 |
| Wrights Cove Terminal Bay 1 (2334) | 111 Marketplace Dr | East side of Marketplace Dr | New stop at Wrights Cove Terminal, includes installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd | Pending 2027 construction |
| Wrights Cove Terminal Bay 2 (2335) | 112 Marketplace Dr | East side of Marketplace Dr | New stop at Wrights Cove Terminal, includes installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd | Pending 2027 construction |
| Wrights Cove Terminal Bay 3 (2336) | 113 Marketplace Dr | East side of Marketplace Dr | New stop at Wrights Cove Terminal, includes installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd | Pending 2027 construction |
| Wrights Cove Terminal Bay 4 (2337) | 114 Marketplace Dr | East side of Marketplace Dr | New stop at Wrights Cove Terminal, includes installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd | Pending 2027 construction |
| Wrights Cove Terminal Bay 5 (2338) | 115 Marketplace Dr | East side of Marketplace Dr | New stop at Wrights Cove Terminal, includes installation of a concrete landing pad and concrete bus bay, terminal will also include a passenger waiting area, washrooms, and a multi-use path to Windmill Rd | Pending 2027 construction |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Barrington St Before Devonshire Ave (2372) | Opposite Pusser Ln | Northeast side of Barrington St | Installation of concrete bus pad between curb and sidewalk | Started September 2026 |
| Bayers Rd After Windsor St (6192) | 6264 Barracks Dr | North side of Bayers Rd | Replacement of concrete bus stop pad and concrete sidewalk | Started July 2026 |
| Bayers Rd Before Connolly St (6201) | 6487 Bayers Rd | North side of Bayers Rd near Civic 6487 | Removal of bus stop signage | Started July 2026 |
| Bayers Rd Before Oxford St (6196) | 3139 Oxford St | North side of Bayers Rd | Replacement of concrete bus stop pad and concrete sidewalk | Started July 2026 |
| Kempt Rd After Lady Hammond Rd (7045) | 3700 Kempt Rd | South side of Kempt Rd | Removal of bus stop signage | Completed August 2026 |
| Kempt Rd Before Young St (8635) | 3170 Kempt Rd | South side of Kempt Rd | Removal of bus stop signage | Completed August 2026 |
| Windsor St After Young St (2015) | 3170 Husky Dr | Northeast side of Windsor St | Removal of half shelter, closure of stop for duration of construction impacting access to bus stop | Completed March 2026 |
| Windsor St Before Cork St (8571) | 2953 Windsor St | Northeast side of Windsor St | Installation of concrete shelter pad and shelter | Started June 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Almon St After Connolly St (2392) | 6515 Almon St | Northwest side of Almon St at Civic 6515 | Installation of asphalt bus pad | Completed May 2026 |
| Almon St After Oxford St (2391) | 6427 Almon St | Northwest side of Almon St at Civic 6427 | Installation of asphalt bus pad | Completed May 2026 |
| Almon St Before Connolly St (2393) | 6518 Almon St | Southeast side of Almon St at Civic 6518 | Installation of asphalt bus pad | Completed May 2026 |
| Almon St Before Oxford St (2394) | 6424 Almon St | Southeast side of Almon St at Civic 6424 | Installation of asphalt bus pad | Completed May 2026 |
| Bayers Rd After Oxford St (6195) | 6380 Bayers Rd | South Side of Bayers Rd near Civic 6380 | Removal of bus stop sign | Pending 2026 construction |
| Bayers Rd Before Connolly St (6203) | 6512 Bayers Rd | South side of Bayers Rd at Civic 6512 | Replacement of abutting concrete sidewalk and shelter pad | Pending 2026 construction |
| Bayers Rd Before Windsor St (6191) | 6286 Bayers Rd | South side of Bayers Rd at Civic 6286 | Replacement of concrete bus stop pad, shelter pad and concrete sidewalk | Pending 2026 construction |
| Connaught Ave After Bayers Rd (2390) | 3066 Connaught Ave | Southwest side of Connaught Ave at Civic 3066 | Installation of asphalt bus pad | Completed May 2026 |
| Connaught Ave Before Bayers Rd (2389) | 3055 Connaught Ave | Northeast side of Connaught Ave at Civic 3055 | Installation of asphalt bus pad | Completed May 2026 |
| Joseph Howe Dr After Scot St (2325) | 3601 Joseph Howe Dr | East side of Joseph Howe Dr near the Superstore | Installation of bus shelter | Completed February 2026 |
| Oxford St After North St (7411) | 2619 Oxford St | East side of Oxford St near Civic 2619 | Reinstatement of asphalt bus pad between curb and sidewalk | Started September 2026 |
| Oxford St Before Liverpool St (7416) | 2962 Oxford St | Northeast side of Oxford St at Civic 2962 | Installation of bus-bulb curb extension to increase waiting area at bus stop and decrease crossing distance at crosswalk on Oxford St | Pending 2027 construction |
| Oxford St Before Liverpool St (7417) | 2933 Oxford St | Southwest side of Oxford St at Civic 2933 | Installation of bus-bulb curb extension to increase waiting area at bus stop and decrease crossing distance at crosswalk on Oxford St | Pending 2027 construction |
| Robie St Before Cedar St (8196) | 1756 Robie St | West side of Robie St abutting Civic 1756 | Extension of existing concrete bus pad to larger pad, relocation of signpost | Pending 2026 construction |
| Windsor St Before Almon St (8557) | 2840 Windsor St | Southwest side of Windsor St near Civic 2840 | Installation of asphalt bus pad and relocation of bus stop signage, bus stop moving approximately 30m to new location further north of intersection | Completed May 2026 |
| Windsor St Before Liverpool St (2326) | 2966 Windsor St | Southwest side of Windsor St at Civic 2966 | Installation of new concrete bus pad between sidewalk and curb, new signpost | Pending 2027 construction |
| Windsor St Before London St (8564) | 6265 London St | Southwest side of Windsor St at Civic 6265 | Removal of bus stop signage, bus stop moving to new location Windsor St Before Liverpool St (2326) | Pending 2027 construction |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Dutch Village Rd After Andrew St (2362) | 3569 Dutch Village Road | East side of Dutch Village Rd at Civic 3569 | Replacement of temporary asphalt bus pad with concrete, installation of tactile warning indicator plates within bus pad, slight relocation of signpost | Completed July 2026 |
| Dutch Village Rd Before Central Ave (2363) | 3464 Dutch Village Road | West side of Dutch Village Rd near Civic 3464 | Slight relocation of tactile warning indicator plates | Completed July 2026 |
| Dutch Village Rd Before Central Ave (6788) | 3425 Dutch Village Road | East side of Dutch Village Rd near Civic 3425 | Replacement of temporary asphalt bus pad with concrete, installation of tactile warning indicator plates within bus pad, slight relocation of signpost | Completed July 2026 |
| Dutch Village Rd Before Rufus Ave (6614) | 3600 Dutch Village Road | West side of Dutch Village Rd near Civic 3600 | Replacement of temporary asphalt bus pad with concrete, installation of tactile warning indicator plates within bus pad, slight relocation of tactile warning indicator plates within sidewalk | Completed July 2026 |
| Kearney Lake Rd After Hamshaw Dr (7021) | 209 Kearney Lake Road | North of Kearney Lake Rd abutting Civic 209 | Relocation of bus stop to the east, installation of new concrete bus pad and bus layby with connection to multi-use path | Pending 2026 construction |
| Main Ave After Titus St (7166) | 60 Main Avenue | East side of Main Ave near Civic 60 | Reinstatement of concrete bus pad and shelter | Pending 2026 construction |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Herring Cove Rd After Glen Baker Dr (2401) | 894 Herring Cove Rd | Northeast side of Herring Cove Rd | Installation of new concrete bus pad, abutting sidewalk and curb with pedestrian ramps connecting to existing sidewalk on Glen Baker Dr, retaining wall repairs, new signposts | Starting October 2026 |
| Herring Cove Rd After Glen Baker Dr (2402) | Opposite 898 Herring Cove Rd | Southwest side of Herring Cove Rd | Installation of new concrete bus pad, abutting sidewalk and curb with pedestrian ramps and RRFB pedestrian signals connecting to existing sidewalk on Glen Baker Dr, new retaining wall, new handrail, new signposts | Starting October 2026 |
| Herring Cove Rd Before Dentith Rd (6853) | 349 Herring Cove Rd | South side of Herring Cove Rd | Replacement of concrete curb, installation of new concrete bus pad between sidewalk and curb | Started September 2026 |
| Herring Cove Rd Before Glen Baker Dr (6896) | 898 Herring Cove Rd | Northeast side of Herring Cove Rd | Removal of bus stop, being replaced by new bus stop Herring Cove Rd After Glen Baker Dr (2401) approximately 50m northwest | Starting October 2026 |
| Herring Cove Rd Opposite Glen Baker Dr (6912) | Opposite 894 Herring Cove Rd | Southwest side of Herring Cove Rd | Removal of bus stop, being replaced by new bus stop Herring Cove Rd After Glen Baker Dr (2405) approximately 45m southeast | Starting October 2026 |
| Purcells Cove Rd After Sailboat Ln (8122) | Opposite 1255 Purcells Cove Rd | Northside of Purcells Cove Rd | Extension of asphalt shelter pad to improve accessibility of bus stop | Pending 2026 construction |
| Ridgevalley Rd After Cavendish Rd (8166) | 1 Cavendish Rd | Northeast side of Ridgevalley Rd | Bus stop relocation closer to Cavendish Rd, new concrete bus pad at bus stop, new sidewalk connecting to Cavendish Rd with new curb and pedestrian ramp | Starting October 2026 |
| Ridgevalley Rd After Limerick Rd (8167) | 49 Ridgevalley Rd | Northeast side of Ridgevalley Rd | Relocation of bus stop approximately 25m southeast, installation of new concrete bus pad, new abutting sidewalk connecting to Limerick Rd with new curb and pedestrian ramp | Starting October 2026 |
| Ridgevalley Rd Before Bromley Rd (2403) | Opposite Civic 23 | Southwest side of Ridgevalley Rd | Installation of new concrete bus pad and signpost | Starting October 2026 |
| Ridgevalley Rd Before Bromley Rd (8168) | 30 Ridgevalley Rd | Southwest side of Ridgevalley Rd | Removal of bus stop, being replaced by new bus stop Ridgevalley Rd Before Bromley Rd (2403), approximately 75m northwest | Starting October 2026 |
| Ridgevalley Rd Before Highfield St (8169) | Opposite 141 Ridgevalley Rd | West side of Ridgevalley Rd | Replacement of concrete bus pad | Starting October 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Farnham Gate Rd Opposite Ross St (6647) | 110 Farnham Gate | South side of Farnham Gate adjacent civic 110 | Installation of new shelter on the bus pad | Completed March 2026 |
| Lakelands Blvd After St Margarets Bay Rd (7119) | 5 Lakelands Blvd | East side of Lakelands Blvd adjacent to civic 5 | Relocation of bus stop and shelter approximately 15m north, installation of new concrete bus pad, shelter pad, and sidewalk connecting to Chain Lake Dr intersection | Construction starting September 2026 |
| Lakelands Blvd Before St Margarets Bay Rd (7120) | Opposite 5 Lakelands Blvd | West side of Lakelands Blvd opposite civic 5 | Relocation of bus stop approximately 70 meters north, installation of new concrete bus pad, sign post and new concrete sidewalk connecting to Chain Lake Dr intersection | Construction starting September 2026 |
| Parkland Dr After Castlepark Grv (9029) | Between Castlepark Grv intersections | East side of Parkland Dr between Castlepark Grv intersections | Replacement of concrete curb and concrete bus pad | Completed June 2026 |
| Parkland Dr After Kearney Lake Rd (9043) | 998 Parkland Dr | North side of Parkland Dr adjacent to civic 998 | Replacement of concrete curb at bus stop | Completed June 2026 |
| Parkland Dr Before civic 680 (9036) | Before 680 Parkland Dr | West side of Parkland Dr before civic 680 | Replacement of concrete curb at bus stop | Completed June 2026 |
| Parkland Dr Before Heathside Cr (9025) | Opposite 548 Parkland Dr | East side of Parkland Dr opposite to civic 548 | Replacement of concrete curb at bus stop | Completed June 2026 |
| Parkland Dr Opposite Carlina Ct (7425) | Opposite Carlina Crt | West side of Parkland Dr opposite to Carlina Crt | Replacement of concrete curb at bus stop | Completed June 2026 |
| Parkland Dr Opposite civic 680 (9027) | Opposite 680 Parkland Dr | East side of Parkland Dr opposite to civic 680 | Replacement of concrete curb at bus stop | Completed June 2026 |
| Radcliffe Dr Before Raleigh Ct (6658) | 159 Radcliffe Dr | North side of Radcliffe Dr abutting civic 159 | Relocation of bus stop 50m north on Radcliffe Dr with new concrete bus pad between sidewalk and curb | Construction starting September 2026 |
| Susie Lake Cr After Hobsons Lake Dr (2311) | Near 265 Susie Lake Cres | North side of Susie Lake Cres near civic 265 | Installation of new bench on bus pad | Completed July 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Hanwell Dr After Barnsley Ct (2067) | 131 Hanwell Dr | North of Hanwell Dr, approx 10m from Barnsley Ct intersection near Civic 131 | Relocation of bus stop from current location approx 40m east of Hanwell Dr, installation of concrete bus pad and signpost with connecting sidewalk and pedestrian ramp | Completed September 2026 |
| Millwood Dr After Sackville Dr (7233) | 1129 Millwood Dr | East side of Millwood Dr near Civic 1129 | Installation of concrete pad for bench | Started September 2026 |
| Bus Stop Location | Nearest civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest civic Address | Location of Work | Scope of Work | Status |
| First Lake Dr After Cabot Cr (6679) | 320 First Lake Dr | East side of First Lake Dr adjacent civic 320 | Removal of concrete bus pad, reinstatement of sod, bus stop consolidation of First Lake Dr After Cabot Cr (6679) and First Lake Dr Before Crimson Dr (6689) at new location First Lake Dr After Crimson Dr (2374) approximately 145m south near civic 356 | Pending 2026 construction |
| First Lake Dr After Cavendish Dr (6687) | 289 First Lake Dr | West side of First Lake Dr | Removal of existing bus stop signage, stop being replaced by new bus stop First Lake Dr Before Cavendish Dr (2373) approximately 95m north near civic 259 | Completed December 2025 |
| First Lake Dr After Civic 192 (6683) | 192 First Lake Dr | North side of First Lake Dr near civic 192 | Installation of new signpost, extension of existing bus pad and replacement of existing curb | Pending 2026 construction |
| First Lake Dr After Crimson Dr (2374) | 356 First Lake Dr | East side of First Lake Dr adjacent to civic 356 | New bus stop replacing First Lake Dr After Cabot Cr (6679) and First Lake Dr Before Crimson Dr (6689), installation of concrete bus pad and signpost | Pending 2026 construction |
| First Lake Dr After Crimson Dr (6680) | Near 373 First Lake Dr | West side of First Lake Dr near civic 373 | Replacing existing concrete bus pad, installation of new concrete sidewalk connecting bus stop to new marked crosswalk at Crimson Dr intersection | Pending 2026 construction |
| First Lake Dr Before Cavendish Dr (2373) | 259 First Lake Dr | West side of First Lake Dr near civic 259 | New stop replacing First Lake Dr After Cavendish Dr (6687), installation of concrete bus pad between curb and sidewalk | Completed December 2025 |
| First Lake Dr Before Cavendish Dr (6686) | Adjacent 2 Cavalier Dr | North side of First Lake Dr opposite civic 289 | Relocation of signpost to the boulevard in front of bus pad | Pending 2026 construction |
| First Lake Dr Before Crimson Dr (6689) | Adjacent 1 Crimson Dr | East side of First Lake Dr adjacent to civic 1 Crimson Dr | Removal of concrete bus pad and signpost, reinstatement with sod, bus stop consolidation of First Lake Dr After Cabot Cr (6679) and First Lake Dr Before Crimson Dr (6689) at new location First Lake Dr After Crimson Dr (2374) | Pending 2026 construction |
| First Lake Dr Before Quaker Cr (6691) | 170 First Lake Dr | North side of First Lake Dr near civic 170 | Replacement of existing concrete bus pad, installation of new concrete sidewalk connecting to Quaker Cr intersection | Pending 2026 construction |
| First Lake Dr Opposite Civic 200 (6693) | Opposite 192 First Lake Dr | Southwest side of First Lake Dr opposite civic 192 | Removal of concrete bus pad and signpost, reinstatement with sod, bus stop being replaced by new bus stop First Lake Dr Opposite Civic 204 (2375) approximately 41m east opposite civic 204 | Pending 2026 construction |
| First Lake Dr Opposite Civic 204 (2375) | Opposite 204 First Lake Dr | Southwest side of First Lake Dr opposite civic 204 | New stop replacing First Lake Dr Opposite civic 200 (6693), installation of concrete bus pad between curb and sidewalk | Pending 2026 construction |
| Sackville Dr After Beaver Bank Rd (9037) | 840 Sackville Dr | South Side of Sackville Dr near civic 840 | Replacement of concrete curb, concrete bus pad and sidewalk connected to the bus pad | Completed August 2026 |
| Sackville Dr After Sackville Cross Rd (7305) | 560 Sackville Dr | South side of Sackville Dr near civic 560 | Replacement of concrete curb and sidewalk connected to bus pad | Completed August 2026 |
| Sackville Dr At Civic 622 (2275) | 622 Sackville Dr | South side of Sackville Dr near civic 622 | Replacement of concrete curb and concrete bus pad | Completed August 2026 |
| Sackville Dr At Civic 791 (7318) | 790 Sackville Dr | South side of Sackville Dr adjacent to civic 790 | Replacement of concrete curb, concrete bus pad and sidewalk connected to bus pad | Completed August 2026 |
| Sackville Dr Before Beaver Bank Rd (7297) | 833 Sackville Dr | North side of Sackville abutting civic 833 | Replacement of concrete curb, concrete bus pad and sidewalk connected to bus pad | Construction started August 2026 |
| Sackville Dr Before Riverside Dr (7329) | 667 Sackville Dr | North side of Sackville Dr near civic 667 | Replacement of concrete curb, concrete bus pad and sidewalk connected to bus pad | Construction started September 2026 |
| Sackville Dr Before Sackville Cross Rd (7311) | 567 Sackville Dr | North side of Sackville Dr near civic 567 | Replacement of concrete curb at bus pad | Construction starting September 2026 |
| Sackville Dr Opposite Civic 614 (7310) | 619 Sackville Dr | North side of Sackville Dr near civic 619 | Replacement of concrete curb, concrete bus pad and sidewalk connected to the bus pad | Construction starting September 2026 |
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
|---|---|---|---|---|
| Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
| Bedford Hwy After River Ln (6245) | 1698 Bedford Hwy | West side of Bedford Hwy | Replacement of concrete shelter pad, temporary removal of shelter to allow for construction to be completed | Started September 2026 |